Thursday, January 1, 2009

Inches away from being done

The "completed" kitchen...
Here is the new heater vent, routed through the toe-kick of the cabinet:
All of the drawers have the soft-close feature, where it's impossible to slam them and they kind of close themselves the last inch or so. In addition, some of the neater cabinets are:
Lazy susan above the bread box:
Pull-out spice cabinet:
Double-layered drawers:
Lower corner notched lazy susan:Memo/Key Center just inside the door:

Just a few things still need to be done:
*shelves (and supports) in the bar; they'd ordered the wrong kind
*some quarter round trim around a few cabinets

And that is all. If I get a chance, I'll try to put together a before-and-after type post of everything. Lots has happened in six months. :)

No comments: