Sunday, October 5, 2008

Electrical is moving along

Artie came today to do some electrical. The main thing was to switch the box from 60 to 100:
But he also ran a wire for the (future) garbage disposal:
and moved one of the switch boxes since the stove/microwave is no longer going in the corner:
He connected the switch for the ceiling fan/light (but it's not connected to the box) and installed the GFIC in the bathroom:
He'll be back next weekend to (hopefully) "finish up".


Yesterday we did some little stuff around the house.

G. removed the old bathroom ceiling fan and "installed" the new one (again, see above, it's not functional yet, but is in place).

Mom and I emptied and cleaned one bedroom (the medium-sized one) so we/she can get at least one room "set up" soon. This will be the computer room and her new computer arrived on Friday, so we might be able to set that up soon.
I installed the doorbell and doorbell buttons (which work most of the time):And we found at least a few things that we'll need/want to change on the cabinet layout before ordering on Wednesday.

No comments: